ABOUT US
Tongxiang Guangming Knitting Co. Ltd.
The company insists to the management tenet of "quality first, always seeking for excellence and trustworthiness as the base", and achieves a stable and healthy development from cultivating human resources and strengthening management. Our main products are as follows: 1. Normal Products: jersey, spandex jersey, spandex small terry, terry fabric, drawn flannelette fabric, tripped fabric, cotton fabric, printed fabric, etc. 2. Intermediate and the high-end products: Modal, imitation silk, tight-twist, flax, bright yarn cotton, etc.; 3. Mixed-spun products: viscose, cotton, polyester, cotton modal, wool, nylon, cashmere, silk, etc. normal metallic fabric , ultra-fine underwear metallic fabric, acrylic and other mixed-spinning of textile products; 4. clothing making for above various materials. The company has established good cooperation relationship with the raw material suppliers in Ji angsu, Ningbo, Shandong, Hebei etc.
Company Establishment
Staff
Product range
Company size
Development history
Product Center
Video showcase
Qualification certificate
Small and medium-sized enterprise production investment award
Small and medium-sized enterprise production investment award
Work safety standardization
Process Flow
01
Master the basic information, requirements, and quotations of the project, build a professional team for tracking, and connect with the project situation and details in real-time.
02
According to the exhibition outline, carry out spatial layout design, zoning design, sub item display design, and overall deepening design, develop display requirements and construction drawings, and develop strong and weak current wiring requirements.
03
According to the engineering design requirements, carry out engineering construction and deliver on time to meet the level required by the construction plan.
04
After the project meets the delivery standards, the project manager arranges relevant personnel to conduct on-site debugging and improvement, allowing customers to accept it, and provides professional operation training for the staff to ensure smooth project operation.
05
After the project meets the delivery standards, the project manager arranges relevant personnel to conduct on-site debugging and improvement, allowing customers to accept it, and provides professional operation training for the staff to ensure smooth project operation.